Palouse River Bank Stabilization at Camp Grizzly North of Harvard – 2016
This project constructed to prevent further erosion of the river bank which was threatening to take out a fence and was eating up usable area.




This project constructed to prevent further erosion of the river bank which was threatening to take out a fence and was eating up usable area.