Stream Conversion by Hatter Creek Earthworks

Palouse River Bank Stabilization at Camp Grizzly North of Harvard – 2016

This project constructed to prevent further erosion of the river bank which was threatening to take out a fence and was eating up usable area.

Stream Conservation by Hatter Creek Earthworks
Eroded river bank prior to construction
Stream Conservation by Hatter Creek Earthworks
River bank after stabilization with rip-rap
Stream Conservation by Hatter Creek Earthworks
Re-contouring river bank prior to placing Rip-Rap
Stream Conservation by Hatter Creek Earthworks
Rip-Raped river bank with willow cuttings planted along the toe of the bank and a rock barb.